Tender
Loading the tender
Something wrong on this page? Tell us
Loading the tender
Something wrong on this page? Tell us
800kW solar carport, 400kW battery and 60 charge points at County Hall
The latest changes, from the notice published 19 May 2020.
Charging as part of wider works: chargers in car parks.
Charger specification
Request a full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialThe Contracting Authority has a requirement for a Contractor to undertake the design and build (RIBA stages 4-6) of an 800KW solar photovoltaic car port, 400KW battery storage, 10 rapid electric vehicle charging points and 50 fast electric vehicle charging points installed in the rear car park of its County Hall office building. The Contracting Authority requires the system to integrate an energy management system that maximises the use of the solar within the building and the electric vehicle charge points. The system must have a lifespan of not less than 25 years and should be designed and installed accordingly. \r \r Further details of the Contracting Authority's requirements under the contract and other relevant information are given in the Invitation to Tender, Schedule 2- Specification. \r All tender documentation can be found on the NEPO Portal reference number DN443516.