Tender
Loading the tender
Something wrong on this page? Tell us
Loading the tender
Something wrong on this page? Tell us
15-year concession to operate and maintain Sunderland's ORCS and LEVI-funded EV charge points, Connected Kerb, estimated value £10,440,749
The latest changes, from the notice published 26 November 2026.
Charging only: chargers at mixed sites, for any vehicle.
Charger specification
The notice gives no charger count, types or power.
Sunderland City Council has signed a 15-year concession with Connected Kerb to operate and maintain the ORCS and LEVI-funded charge points, running from 19 November 2026 to 18 November 2041. The £10,440,749 is possible operator income, not council spend. The full analysis covers why the contract was awarded directly, who carries the risk and what is still not stated.
Read our full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialConcession Contract for electric vehicle charging units at specific ORCS and LEVI Funded Sites. Sunderland City council (SCC) requires the ongoing operation and maintenance of the installed EV charging infrastructure associated with the ORCS and Pilot LEVI schemes. These requirements include for regular maintenance, any necessary repairs or replacements, cleaning and annual inspections of the installed EVCI Units.
No documents are attached to this notice.