Sunderland plans 15-year charging concession, estimated £11m; tender notice due February 2027
Bidding hasn’t opened. Watch this tender and we’ll notify you when it does.
Charging only: chargers at destinations, for any vehicle.
Charger specification
Sunderland City Council plans a 15-year concession for fast and rapid public charging at visitor destinations, with an estimated total value of £11m and the tender notice expected on 1 February 2027. The full analysis sets out the funding model in the notice's own words, including the capital an operator must put in, who this suits, how it follows the council's other charging concession, and what the notice leaves open.
Read our full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialSunderland City Council intends to procure an experienced operator for the installation, operation and maintenance of publicly accessible electric vehicle (EV) charging infrastructure across a number of locations within Sunderland. The requirement is to install higher power fast (22kw) and rapid charging (50kw) infrastructure based on lesser dwell times for sites at visitor and destination locations. The project forms part of the Council's wider transition towards zero-emission transport and is intended to increase the availability, accessibility and reliability of public EV charging infrastructure, particularly for visitors to the locations at which the infrastructure will be installed. The project is being supported through the City Region Sustainable Transport Settlement (CRSTS). The funding arrangements include a requirement for private-sector investment, with the appointed Operator expected to provide a minimum 15% capital contribution towards the infrastructure. The proposed contract will comprise an initial construction and installation phase, followed by an operational concession period of up to 15 years. The installation requirements are expected to include the supply, installation and commissioning of EV charging infrastructure across multiple sites, together with all associated electrical, civil engineering, connection and ancillary works necessary to bring the infrastructure into operation. The infrastructure will be required to comply with all applicable technical, regulatory, statutory and accessibility requirements, as amended or superseded from time to time. Following commissioning, the Operator will be responsible for the ongoing operation, management and maintenance of the charging infrastructure. Responsibilities are expected to include charger availability, planned and reactive maintenance, fault response, payment arrangements, customer support, remote monitoring and the provision of operational and performance information to the Council. The arrangement will be procured as a concession contract, under which the Operator will have the opportunity to generate income from the provision of EV charging services, principally through charges paid by users of the infrastructure. The Operator will therefore assume an appropriate level of commercial and operational risk associated with the operation of the charging network. The concession arrangements are expected to address matters including tariffs and payment mechanisms, payments or revenue share to the Council, performance standards, contract monitoring, asset ownership and responsibilities, maintenance and lifecycle obligations, and the allocation of commercial and operational risk between the Council and the Operator.