Tender detail
This tender is still in planning. Watch it and we’ll alert you the moment bidding opens.
Supply, install & maintain EV charging across National Grid sites with back-office management system
Opportunity snapshot
Estimated value
—
Region
United KingdomSubmission deadline
Not disclosed
Contract period
From 30 Jun 2027 · Ends 29 Jun 2032
Evidence
Breakdown
National Grid is lining up a five-year EV charging programme for its own substations and offices, split into build, mobile-charger and back-office lots, with a subcontractor panel beneath the main build. The full analysis shows which lot fits which kind of supplier, why this is corporate-funded rather than grant-backed, where the real supply-chain opening sits, and exactly what is and is not confirmed yet, because at this planning stage the value and deadline are still open. One to position for now.
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by NATIONAL GRID UK LIMITED
OCDS release history
Contract Start
ProcurementExpected contract commencement
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
Civils, installation and supply of AC & DC chargers Participate in the design for each site Supply all hardware, cable and switchgear associated with the installations Appoint a panel of subcontractors Install the charge points, cabling and switchgear Commissioning: powerup and test the chargepoints Provide warranties on the hardware and installation Hand over the charge points to the Lot 3 provider for onboarding to a private cloud Provide on-site support
Contract: 30 Jun 2027 to 29 Jun 2032 (60 months)
The supply of Mobile DC chargers
Contract: 30 Jun 2027 to 29 Jun 2032 (60 months)
System operating platform and annual / reactive maintenance Back office support: Create a dedicated instance of the delivery system in a private cloud Install connectivity (SIM) Commission chargers Provide day to day remote support to users and charge points Provide RFID cards if required Collect payments for charging and return monies to National Grid Ensure that where onsite support is required, an engineer is deployed Provide MI to National Grid to enable measurement of KPIs and SLAs Provide on site support and maintenance
Contract: 30 Jun 2027 to 29 Jun 2032 (60 months)