Tender detail
Bids are open. Deadline 26 October 2026.
Single supplier to deliver and manage ~20,000 EV chargers across Places for People and Anchor homes, 10+5 years, £40M incl. VAT
Region
LondonSubmission deadline
26 Oct 2026
Contract period
From 8 Apr 2027 · Ends 8 Apr 2037 (extendable to 8 Apr 2042)
Evidence
Places for People and Anchor Hanover Group are now out to tender, closing midday on 26 October 2026 after a one-week extension, for one supplier to install and run EV charging across both estates: ten years from April 2027, extendable to fifteen, with a published total of £40,000,000 including VAT across the two lots. It is client-funded, so the landlords pay for the infrastructure and own it. The full analysis covers what that funding model means for your bid, the five-then-two shortlisting funnel and what it demands on day one, the split between 19,500 driveway points and the harder retrofit work, and the two figures in the notice that do not agree.
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by PLACES FOR PEOPLE GROUP LIMITED
OCDS release history
Source Update
ChangeUpdated: Buyer, Ev Is Concession, Ev Procurement Arrangement, Ev Procurement Competition, EV relevance score, Pre-market stage, Published date, Short title, Status, Submission deadline, Title, Updated date, Value
Pipeline — detected 21/09/2026
Notice Updated
ProcurementLatest notice version published on Find a Tender
OCDS release
Source Update
ChangeUpdated: Amendments, Buyer Org, Charger Spec Json, Contract Extension Date, Submission deadline, Documents, Documents, Notice link, Published date, Updated date
Pipeline — detected 09/10/2026
Submission Deadline
ProcurementSubmissions due by 26/10/2026
Contract Start
ProcurementExpected contract commencement
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
This Lot covers the provision of a fully managed electric vehicle charging infrastructure solution across the Places for People Group portfolio. The scope includes the design, supply, installation, commissioning, operation, maintenance, monitoring and lifecycle management of electric vehicle charge points, together with associated software platforms, payment processing, customer support and reporting services. The delivery model is intended to provide a long-term partnership with full lifecycle management of EV charging infrastructure. Based on current forecasts, the Employer anticipates approximately 20,000 charge points over the initial ten-year period, comprising approximately 19,500 driveway charge points and 500 retrofit charge points. These volumes are indicative only and are provided solely to assist bidders in understanding the potential scale of the opportunity. No minimum or guaranteed volume of work is offered, and actual requirements may be higher or lower than the figures stated. The Employer reserves the right to vary the rollout profile, timing, locations and volumes throughout the contract term in accordance with operational requirements, funding availability and asset strategies.
Contract: 8 Apr 2027 to 8 Apr 2037 (120 months)
Award Criteria
This Lot covers the provision of a fully managed electric vehicle charging infrastructure solution across Anchor's property portfolio. The scope includes the design, supply, installation, commissioning, operation, maintenance, monitoring and lifecycle management of electric vehicle charge points, together with associated software platforms, payment processing, customer support and reporting services. The delivery model is intended to provide a long-term partnership with full lifecycle management of EV charging infrastructure. Based on current forecasts, the Employer anticipates approximately 4,000 charge points over the initial ten-year period, comprising approximately 2,000 driveway charge points and 2,000 retrofit charge points. These volumes are indicative only and are provided solely to assist bidders in understanding the potential scale of the opportunity. No minimum or guaranteed volume of work is offered, and actual requirements may be higher or lower than the figures stated. The Employer reserves the right to vary the rollout profile, timing, locations and volumes throughout the contract term in accordance with operational requirements, funding availability and asset strategies.
Contract: 8 Apr 2027 to 8 Apr 2037 (120 months)
Award Criteria
Buyer
LHC Procurement Group for the Welsh Procurement Alliance (WPA)Region
LondonValue
Value not statedEV charging infrastructure
3-vehicle EV lease & maintenance for West London NHS Trust Facilities Dept
Buyer
West London NHS TrustRegion
LondonValue
Electric vehicles"Provision of three electric vehicles for the Facilities Department under an existing lease arrangement, including a…"