TED is live: 30% off your first payment with code TED30 at checkout. See plans
Tender detail
We’ve marked this tender presumed closed: the submission deadline has passed with no award recorded.
EV charging is part of a larger contract. Watch the award to spot a potential subcontracting client.
Taunton Deane Borough Council: principal contractor to design and build the Coal Orchard mixed-use development, Taunton, including a 42-space car park with 3 electric car charging points; restricted procedure, works to end August 2020
Region
South West EnglandSubmission deadline
24 Sept 2018
Contract period
Ends 31 Aug 2020
Evidence
Breakdown
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by Taunton Deane Borough Council
OCDS release history
Submission Closed
ProcurementSubmission period ended
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
Taunton Deane Borough Council has a vision to create a versatile mixed use development through a Local Authority directed build programme to support its ambitious growth programme. The Council seeks to appoint a suitably accredited and demonstrably experienced Principal Contractor to undertake the design and construction of Coal Orchard Development under an NEC 3 Engineering and Construction Contract (Option A) with secondary options and z clauses as set out in the procurement documents. This procurement is being carried out by Taunton Deane Borough Council (TDBC). TDBC want to select a Principal Contractor to provide the Works described in this ITT. This procurement is being conducted under the Restricted Procedure pursuant to Regulation 28 of the Public Contracts Regulations 2015 as amended (the 2015 Regulations). Subject to there being a sufficient number of Applicants expressing interest and passing the Minimum Standards described in Part 2 of this SQ, the Authority’s intention is to invite a minimum of 3 and a maximum of 5 Applicants to participate at tender stage based on their ranking against the scored questions. In the event that more than one Applicant achieves the same score in fifth place, the Authority reserves the right to invite all or none of the fifth place Applicants to the Tender stage. The construction works shall comprise site works including necessary 278 works, site access roads, earthworks, enabling works, new statutory services connections including to existing, access roads, 42 space car park (inc 2nr accessible and 3nr electric car charging points), landscaping/public realm, steps to river frontage and drainage. Certain off site works, including services, drainage and highways works are identified in the works information and will form part of the works.
EV charging concession contract for Somerset Council
Buyer
Somerset CouncilRegion
South West EnglandValue
Value not statedDirect EV charging"Concession contract for supply of Electric Vehicle Charging Infrastructure and Associated Services"
Outdoor EV charger installation at Carlton Street Car Park, North Somerset
Buyer
North Somerset CouncilRegion
South West EnglandValue
EV charging infrastructure"EV Chargers - Carlton Street Car Park"
Trial installation of pavement channels for EV charging on residential roads in South Gloucestershire
Buyer
South Gloucestershire CouncilRegion
South West EnglandValue
Direct EV charging"South Gloucestershire Council have selected a supplier for a trial period to provide and install cross pavement channels to facilitate the charging of electric vehicles on public r"