Tender
Loading the tender
Something wrong on this page? Tell us
Loading the tender
Something wrong on this page? Tell us
Design, supply & install EV charging at the Skeoge and Strahans Road fleet depots, Derry, for 6 new electric vans (£200k incl. VAT)
We’ve marked this tender presumed closed: the contract start date has passed with no award recorded.
Charging only: chargers at depots.
Charger specification
Derry and Strabane sought tenders to design and install EV charging at two of its fleet depots, the first EV infrastructure at those sites, though the submission deadline (20 February 2026) has now passed. The full analysis is clear about the depot charging scope, why it matters for the council's fleet, and who it suits.
Read our full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialDerry City and Strabane District Council is seeking tenders for the design, supply, installation and commissioning of electric vehicle (EV) charging infrastructure for their Skeoge and Strahans Road Fleet depots. This is set to be the first EV infrastructure to be installed at the depots, and will be critical to the operation of the council’s 6 new electric vans. The Council seeks a future-proof EV charging solution that supports fleet electrification, minimises lifecycle cost, and integrates seamlessly with current and future on-site renewable generation and energy storage. Your submission must be submitted via etendersNI, via this CFT. No other method of submissions will be accepted. Please refer to the CfT documents for further detail.