TED is live: 30% off your first payment with code TED30 at checkout. See plans
Tender detail
We’ve marked this tender presumed closed: no update for over 9 months.
Multi-service framework for NHS estate decarbonisation including EV charging across UK public sector
Opportunity snapshot
Estimated value
£2bn
Region
South East EnglandSubmission deadline
12 Sept 2025
Contract period
From 1 Dec 2025 · Ends 1 Dec 2033
Evidence
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by NHS Commercial Solutions
OCDS release history
Notice Updated
ProcurementLatest notice version published on Find a Tender
OCDS release
Submission Closed
ProcurementSubmission period ended
Contract Start
ProcurementExpected contract commencement
Source Update
ChangeUpdated: Amendments, Buyer Type, Category, Charger Spec Json, Contract dates, Contract dates, Contacts, Contract dates, Contract dates, Description, Contract details, Ev Is Concession, Ev Location, Ev Procurement Arrangement, Ev Procurement Competition, Ev Procurement Shape, EV relevance category, E…
Pipeline — detected 09/10/2026
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
This lot provides expert consultancy services to support the planning, design, development, and optimisation of sustainable estates across healthcare and public sector settings. It aims to help organisations meet environmental targets, improve estate efficiency, and align with national sustainability agendas such as the NHS Net Zero strategy. Services may include sustainability assessments, energy and carbon management planning, green building design guidance, estate decarbonisation roadmaps, and compliance with standards like BREEAM, ISO 14001, and PAS 2060. Environmental consultancy services • Ecological consultancy services • Sustainability consultancy services • Social Value consultancy services Design/architectural services • Sustainable Insulation • Natural Ventilation • Energy Efficient Windows and Doors • Heat Pumps/Passive Cooling Systems • Combined Heat and Power Systems • Rainwater Harvesting • Energy & Water Efficient Appliances • Energy-Efficient Lighting Systems • Solar Shading/Canopy Cover • Solar Film • Solar Power Generation and Storage • Living Walls • Rainwater Gardens • Green Roof Spaces • Wellbeing Green Spaces • Water efficient system • Energy efficient system • Wind Power Generation & Storage
Contract: 1 Dec 2025 to 1 Dec 2033 (96 months)
This lot covers the delivery of building remediation services aimed at improving the sustainability, safety, and compliance of existing healthcare and public sector estates. Services include the assessment, planning, and execution of remedial works to address issues such as poor insulation, inefficient building systems, structural integrity, and legacy materials (e.g. asbestos). The objective is to support energy efficiency, environmental compliance, and the extension of building lifespans in alignment with net-zero and sustainability goals. • 2A - Sustainable Insulation • 2B - Natural Ventilation • 2C - Energy Efficient Windows and Doors • 2D - Heat Pumps/Passive Cooling Systems • 2E - Combined Heat and Power Systems • 2F - Rainwater Harvesting • 2G - Energy & Water Efficient Appliances • 2H - Energy-Efficient Lighting Systems • 2I - Solar Shading/Canopy Cover • 2J - Solar Film • 2K - Water efficient system • 2L - Energy efficient system • 2M – Electric Vehicle Charging Systems/Stations
Contract: 1 Dec 2025 to 1 Dec 2033 (96 months)
This lot provides solutions for on-site power generation and energy storage to support sustainable, resilient, and low-carbon estates. It includes the design, installation, and maintenance of renewable and low-carbon energy systems such as solar PV, wind turbines, combined heat and power (CHP), and battery energy storage systems (BESS). The aim is to reduce reliance on grid energy, lower carbon emissions, improve energy security, and contribute to net zero targets across healthcare and public sector buildings. 3A - Solar Power Generation and Storage 3B – Wind Turbine and wind energy generation systems
Contract: 1 Dec 2025 to 1 Dec 2033 (96 months)
This lot focuses on the integration of nature-based solutions (NbS) to enhance the sustainability, resilience, and biodiversity of healthcare and public sector estates. Services include the design and implementation of green infrastructure such as green roofs and walls, sustainable urban drainage systems (SuDS), habitat creation, tree planting, and natural shading strategies. These solutions aim to support climate adaptation, improve air and water quality, promote biodiversity, and create healthier, more restorative environments for patients, staff, and communities. This Lot is divided into the following sub-lots; • 4A - Living Walls • 4B - Rainwater Gardens • 4C - Green Roof Spaces • 4D - Wellbeing Green Spaces • 4E – Kitchen Garden and Allotment Solutions • 4F – Gardening & Landscaping Services
Contract: 1 Dec 2025 to 1 Dec 2033 (96 months)
To include combination service with a combination of service in Lot 1, 2, 3, and 4 (E.g Could include Bio-solar etc)
Contract: 1 Dec 2025 to 1 Dec 2033 (96 months)