BEIS £1.7M trial to design, build and install a smart meter load control device (HCALCS), combined with an application such as EV charging, in 100 homes
We’ve marked this tender presumed closed: no update for over 9 months.
Charger specification
Request a full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialHAN Connected Auxiliary Load Control Switch (HCALCS) are defined under the Smart Energy Code (SEC Schedule 9); however, no devices have to date been built to this Specification. We are seeking to procure services to design, build and trial an HCALCS, combined with an application such as EV charging, which uses smart meter communications infrastructure.