Tender
Loading the tender
Something wrong on this page? Tell us
Loading the tender
Something wrong on this page? Tell us
15-year residential EV charging concession across Milton Keynes, ~202 chargers, £73.8M
The latest changes, from the notice published 1 July 2026.
Charging only: chargers on streets and at homes, for any vehicle.
Charger specification
Milton Keynes has provisionally picked Qwello for both lots of a residential charging concession, a fifteen-year LEVI-backed programme for around 400 chargepoints across the city. The full analysis separates the £1.44m of LEVI grant from the roughly £74m of operator concession value, explains the two-lot structure, and flags the transition of the council's existing chargers from 2029.
Read our full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialMilton Keynes City Council (the "Council") tendered for the provision of concession contract for Residential EV chargers. The Council has been allocated £1.442M OZEV LEVI (Local Electric Vehicle Infrastructure) Capital funding. The funding will be used to deliver a range of residential, on-street charging infrastructure. With a combination of LEVI funding and private sector funding we are proposing to deliver around 101 charge points per tendered Lot across two geographically split Lots. Each residential locality within the Lots will be assessed for viable EVI installations consisting of a mix of 7-22kw and 50kw chargers. This equates to around 202 charging sockets per Lot. In addition to the installation of new residential charge points, from June 2029, these contracts will also include the transition of all Milton Keynes City Councils existing residential charge points within the localities of each Lot. The procurement is divided in two lots: Blue Lot and Green Lot. The Council proposes to enter into a separate contract for each lot that will be for a term of 15 years.