Tender
Loading the tender
Something wrong on this page? Tell us
Loading the tender
Something wrong on this page? Tell us
Belfast City Council restricted procedure for a main contractor to build the new Roselawn crematorium, with EV charging points in its 220-space car park
The latest changes, from the notice published 22 August 2023.
We’ve marked this tender presumed closed: the submission deadline has passed with no award recorded.
Charger specification
Request a full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialThe project is for the provision of a new crematorium building at Roselawn Cemetery, Ballygowan Road, Belfast. The site is located within the curtilage of the existing Roselawn Cemetery and comprises some 18.2 hectares of a grassed field site. The development has three main components: 1. New Crematorium building, comprising of 2no 200 seat Chapels/ceremony rooms with waiting and welfare spaces for funeral services, Crematory for the incineration of human remains and administration block for ancillary function including office, ash collection, staff changing and staff welfare. The building will be set within a woodland setting with tree lined routes leading to dedicated signposted car parking for each Chapel. Parking is provided for 220 cars including accessible provision and electric charging points, all walkways for parking areas are on a level gradient for ease of access. 2. A New Entrance and right- hand turning lane off the Ballygowan Road is designed to provide a dignified formal threshold to the facility and to ensure that there is no unnecessary disruption to the existing roads. New gates and crematorium signage will be set back from the road edge. The new entrance and right hand turning lane is required to be constructed before the main construction work commences on the new crematorium building to facilitate contractor access to the site. The Ballygowan Road is an A class road with a national speed limit of 60mph. 3. The installation of the cremators and associated works. These will be installed by a specialist contractor appointed separately by the Client. The Contractor must allow for all works associated in liaising with, and providing attendances to, the specialist installer to provide a completed facility ready for operation by the Client by the completion date.
No documents are attached to this notice.