TED is live: 30% off your first payment with code TED30 at checkout. See plans
Tender detail
We’ve marked this tender presumed closed: the submission deadline has passed with no award recorded.
EV charging is part of a larger contract. Watch the award to spot a potential subcontracting client.
Caledonian Maritime Assets marine works at Lochaline ferry terminal: a new sheet-pile aligning structure, slipway upgrade and extension, and a power supply for a hybrid ferry charging point; 12 months, £4.5M
Region
ScotlandSubmission deadline
13 Jul 2018
Evidence
Breakdown
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by Caledonian Maritime Assets Ltd (Utility)
OCDS release history
Submission Closed
ProcurementSubmission period ended
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Ltd (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded Several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through “normal use”. It is therefore considered to have reached the end of its serviceable design life. Project Scope The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are: (a) upgrading and extension of slipway; (b) provision of a power supply for a hybrid ferry charging point; (c) upgrading of the lighting throughout the site (includes marshalling, etc.); (d) increasing the size of the marshalling area; (e) new through road including passenger drop off and parking.
Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Limited (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded. Several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through ‘normal use’. It is therefore considered to have reached the end of its serviceable design life. Project Scope. The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are: a) Upgrading and extension of slipway; b) Provision of a power supply for a hybrid ferry charging point; c) Upgrading of the lighting throughout the site (includes marshalling etc); d) Increasing the size of the marshalling area; e) New through road including passenger drop off and parking
Lochaline Ferry Terminal is located within the Morvern area on the Ardnamurchan peninsula on the West coast of Scotland and owned by Caledonian Maritime Assets Ltd (CMAL). A regular ferry service operates between the slipway at Lochaline and Fishnish on the Isle of Mull. The existing aligning structure at Lochaline is believed to have originally been constructed in the early 1970’s. The structure comprises a series of timber piles at 2,1 m centres with longitudinal walings and raking timber struts to the rear of every other pile. The structure has been upgraded several times in the past including the addition of an inner dolphin circa 1980 and the construction of the outer dolphin in 1998. The vessels operating on this route have increased in size considerably since the structure was first built and consequently the structure is now continuously being damaged through ‘normal use’. It is therefore considered to have reached the end of its serviceable design life. Project scope: The project will consist of the replacement of the existing timber alignment structure with a new continuous twin wall sheet pile alignment structure with a single layer of tie rods. The existing alignment structure will be demolished in 14,5 m long sections commencing from the landward end. Temporary braced piles will be driven at the seaward end of each cell to protect the works from the ferry during construction of the new facility. The new structure will be built some 2 m behind the existing berthing line and will consist of 8 cells. The new alignment structure will be protected by QME 600 CO element type fenders (or similar). The recently constructed access walkway linking the current inner dolphin to the outer dolphin will be demolished once the new alignment structure is constructed. A new, independent, open, piled infill structure will be constructed to link the new alignment structure with the outer dolphin whilst accommodating the crew access gangway. Other works included within the scope are: (a) upgrading and extension of slipway; (b) provision of a power supply for a hybrid ferry charging point; (c) upgrading of the lighting throughout the site (includes marshalling, etc.); (d) increasing the size of the marshalling area; (e) new through road including passenger drop off and parking.
Design and build contract for electric ro-pax ferry on Corran Ferry service, Scotland
Buyer
The Highland CouncilRegion
ScotlandValue
Value not statedVessel electrification or shore power"The Highland Council is seeking to appoint a sole supplier in respect of Shipyard Detailed Design and Build Contract for the procurement of a small, electric roll-on/roll-off passe"
Charge Point Network Operator for ~200 chargers across Stirling, migration from ChargePlace Scotland
Buyer
NatureScot buys a 4x4 road-going electric vehicle for nature reserve maintenance, trialled first, £80k
Buyer
Region
ScotlandValue
EV charging infrastructure"EV Infrastructure Back Office"
Region
ScotlandValue
Electric vehicles"NatureScot requires to purchase a 4x4 road going electric vehicle. The ultimate use of the vehicle will be to serve the maintenance needs of staf…"