Wales and Northern Ireland are now on EVTenders. Read more
Tender detail
We’ve marked this tender presumed closed: the submission deadline has passed with no award recorded.
Two lots across North and West Scotland: 18-month maintenance of 95 chargers, and supply and install of 35 chargers plus 5 in stock, £720k
Region
ScotlandSubmission deadline
30 Jan 2026
Evidence
Breakdown
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by Highlands and Islands Transport Partnership (HITRANS)
OCDS release history
Submission Closed
ProcurementSubmission period ended
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
Supply of 12x 7kW replacement chargers, 21x 22kW replacement chargers and 2x50kW additional chargers for two new sites Install the supplied chargers plus 5 we have in stock (1x50kW, 2x22kW and 2x7kW) utilising local contractors (within the Council area) Please refer to procurement documents for full details
Award Criteria
18 month maintenance contract for 95 chargers utilising local electrical contractors (within each Council area) Please refer to the procurement documents for full details
Award Criteria
Design and build contract for electric ro-pax ferry on Corran Ferry service, Scotland
Buyer
The Highland CouncilRegion
ScotlandValue
Value not statedVessel electrification or shore power"The Highland Council is seeking to appoint a sole supplier in respect of Shipyard Detailed Design and Build Contract for the procurement of a small, electric roll-on/roll-off passe"
Charge Point Network Operator for ~200 chargers across Stirling, migration from ChargePlace Scotland
Buyer
NatureScot buys a 4x4 road-going electric vehicle for nature reserve maintenance, trialled first, £80k
Buyer
Region
ScotlandValue
EV charging infrastructure"EV Infrastructure Back Office"
Region
ScotlandValue
Electric vehicles"NatureScot requires to purchase a 4x4 road going electric vehicle. The ultimate use of the vehicle will be to serve the maintenance needs of staf…"