Tender
Loading the tender
Something wrong on this page? Tell us
Loading the tender
Something wrong on this page? Tell us
3 EV charging points + 49.5kWp solar array install at Sport Wales facility
Charging as part of wider works: chargers at workplaces, for any vehicle.
Charger specification
Request a full analysis of this tender: the funding and the value, the requirements and what the notice leaves open. £79/month · £790/year (save 2 months) · cancel anytime
Start your one month Pro trialREQUIREMENT 1: 1/. 49.5Kwp – 150no. Solar Tier 1 330W Canadian solar perc mono black solar modules with Solar Edge optimised technology The panels will have the following specification: • 10 year product warranty • 25 year performance warranty • 25 year optimisers warranty • AC and DC Isolation Equipment • Generation meter Your installation will consist of: • Erect a scaffold handrail to the perimeter of the building/working area • Install boards to light wells for health and safety where required • Install slate mounting system • Supply and install the panels onto the roof • Supply and install DC cable from the roof back to the inverters to be located within the building • Install the Inverters in the utility area • Supply and install AC cabling with AC isolators. (please note in the AC side quote, we will need to allow for a new fuse board at the solar array side of the cable) • Label the new electrical system showing a PV system has been installed • Commission the system & Train Staff • Leave site clean and tidy. REQUIREMENT 2: Supply and Install 3 new EV Charging Points • Supply new 25mm armoured from 3 phase distribution board covered by 63 amp 3 phase mcb to an IP rated 3 phase consumer unit. Cable to be cleated along building where possible and trenched in where needed. Future proofed for additional EV points as and when required. • Run 2 armoured cables from consumer unit 32amp to EV Charge points • Supply new 10 mm 32 amp supply from 3 phase distribution board to Marine EV charging point. • Cable to be cleated along building where necessary. Connect supplies to 3 phase board • Trenching and groundworks as per requirements Charge point Pedestal with dual 32 am charge points – Rolec Quantum EV RFID for controlled charging – various pay to charge solutions with this unit to allow for inter-company charging and billing to external consumer platform Options Price: Please note that all building/installation work must be completed and invoiced by the 31st of March 2020
No documents are attached to this notice.