Loading
Loading
Tender detail
The submission deadline was 8 July 2026. The buyer may have extended it. Check the current position before assuming it’s closed.
EV charging is part of a larger contract. Watch the award to spot a potential subcontracting client.
Opportunity snapshot
Estimated value
£32m
Evidence
Lancashire Renewables, a council-owned waste company, is tendering a framework to lease mobile plant for its two waste sites, and only one lot touches EV at all. The full analysis is straight about the marginal electric angle: what the framework really covers, where the electric plant sits, and why the £32m spans everything, not electric machines.
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by LANCASHIRE RENEWABLES LIMITED
OCDS release history
Notice Updated
ProcurementLatest notice version published on Contracts Finder
OCDS release
Source Update
ChangeUpdated: Title, Submission deadline
Pipeline — detected 28/05/2026
Source Update
ChangeUpdated: Submission deadline
Pipeline — detected 30/06/2026
Submission Closed
ProcurementSubmission period ended
Contract Start
ProcurementExpected contract commencement
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
The anticipated makeup of the fleet requirement is as follows, with further detail provided in the Tender documentation: Lot 1 • Wheeled Loader Type 1 - 5 based at Leyland, 4 based at Thornton • Wheeled Loader Type 2 - 1 based at Leyland • Telescopic Handler Type 1 - 1 based at Leyland, 1 based at Thornton • Telescopic Handler Type 2 - 1 based at Leyland • Industrial Forklift Truck - 2 based at Leyland, 1 based at Thornton • Triple Mast Forklift - 1 based at Leyland, 1 based at Thornton
Contract: 30 Sept 2026 to 30 Sept 2030 (48 months)
Award Criteria
The anticipated makeup of the fleet requirement is as follows, with further detail provided in the Tender documentation: Lot 2 • Electric Material Handler - 1 based at Leyland, 1 based at Thornton • Diesel Material Handler - 1 based at Leyland, 1 based at Thornton
Contract: 30 Sept 2026 to 30 Sept 2030 (48 months)
Award Criteria
The anticipated makeup of the fleet requirement is as follows: Lot 3 • Slow speed shredder - 1 based at Thornton
Contract: 30 Sept 2026 to 30 Sept 2030 (48 months)
Award Criteria
Notice IDs: 050155-2026, 013063-2025