“…e of service connections (water, electric, gas)
oDucting for new services (e.g. EV charging infrastructure)
oUtility coordination and trenching
•Structural Repairs (if app…” · description
“The scope of this work falls within planned maintenance activities and does not include responsive or reactive repairs. All external works described herein are part of the schedule” · description
⚡Charger Specification
Locations
mixed
classified 10 Jun 2026
Description
The scope of this work falls within planned maintenance activities and does not include responsive or reactive repairs. All external works described herein are part of the scheduled maintenance programme of work which will be shared as part of the tender pack but it is estimated the annual cost of job raised will range between £1.5m - £5m , This figure is subject to change and does not constitute a commitment or guarantee of volume of works
•Access, Roads, and Footpaths
oConstruction or renewal of vehicular access roads and footways
oDropped kerbs and tactile paving
olarge areas of Car park surfacing, markings, and drainage
oPavement and shared surface reinstatement
oKerbing, edging, and surfacing (bitmac, block paving, concrete, etc.)
•Drainage and Surface Water Management
oInstallation or renewal of foul and surface water systems
oSoakaways, attenuation tanks, and Sustainable Drainage Systems (SuDS)
oGullies, manholes, catch pits, and inspection chambers
oCCTV surveys and jetting of existing drainage
oConnection to main sewers
•Foundations and Substructure Works
oConstruction of foundations for:
Bin stores
Scooter/cycle stores
Retaining walls
Boundary walls/fencing
External stores/sheds
Reinforced concrete slabs or bases
•External Works
oStreet furniture (bollards, benches, bin stores)
oLighting columns, ducts, and cable management
•Fencing and Boundary Treatments
oRenewal of fencing (timber, metal, mesh, etc.)
oInstallation of gates and railings
oBrick/block boundary walls and piers
•Utilities and Service Infrastructure
oDiversion or upgrade of service connections (water, electric, gas)
oDucting for new services (e.g. EV charging infrastructure)
oUtility coordination and trenching
•Structural Repairs (if applicable)
•Concrete repairs to external elements (stairs, walkways, retaining walls, balconies)
•Crack stitching and waterproofing
Access Code to respond to PME Questionnaire - R4666DHY7C
To view this notice, please click here:
www.delta-esourcing.com
The scope of this work falls within planned maintenance activities and does not include responsive or reactive repairs. All external works described herein are part of the scheduled maintenance programme of work which will be shared as part of the tender pack but it is estimated the annual cost of job raised will range between £1.5m - £5m , This figure is subject to change and does not constitute a commitment or guarantee of volume of works
•Access, Roads, and Footpaths
oConstruction or renewal of vehicular access roads and footways
oDropped kerbs and tactile paving
olarge areas of Car park…
Unlock the full analysis with Pro
See who should bid, the buyer’s profile and the competitor landscape.
Oldest first: procurement milestones and pipeline-detected changes combined.
📢
Originally Published
Procurement
Tender first published by Amplius Living
OCDS release history
✏️
Notice Updated
Procurement
Latest notice version published on Contracts Finder
OCDS release
Source Update
Change
source-release
Release updated
Pipeline — detected 10/11/2025
🔒
Submission Closed
Procurement
Submission period ended
🔄
Contract Start
Procurement
Expected contract commencement
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.