TED is live: 30% off your first payment with code TED30 at checkout. See plans
Tender detail
We’ve marked this tender presumed closed: the submission deadline has passed with no award recorded.
20-year EV charging concession across the 8 Glasgow City Region councils: ~627 charge points migrated and at least 3,034 new, £785M estimated turnover
Region
ScotlandSubmission deadline
3 Feb 2026
Evidence
Breakdown
Site list available (see source documents)
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by Glasgow City Council
OCDS release history
Submission Closed
ProcurementSubmission period ended
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
In alignment with the Scottish Government and Transport Scotland’s vision for Electric Vehicle Charging Infrastructure (EVCI), the Glasgow City Region(GCR) member authorities aim to support the expansion of a comprehensive network of publicly accessible EVCI across the region. This expansion will be driven by leveraging private sector expertise and capital. It creates a charging network that complements standalone private investment beyond the scope of this initiative. In doing so, GCR aims to work with a CPO through a concession contract that will deliver a comprehensive, convenient, reliable and accessible charging network that meets the needs of users. The CPO will install, own, maintain and operate the Electric Vehicle Charging Infrastructure and any Ancillary Equipment other than that which the Member Authorities have a regulatory duty to adopt. The CPO will be entitled to charge Electric Vehicle Owners for use of the Electric Vehicle Charging Infrastructure. The CPO will be responsible for financing the costs of designing, purchasing, installing, operating, maintaining and upgrading of EV infrastructure net of any capital funding made available to the CPO by the council through the Electric Vehicle Infrastructure Fund or with the local authorities of the GCR as may be agreed with them on an ad-hoc basis. The contract will include: i.The migration of 627 chargepoints across 305 locations for standard, fast and rapid chargepoints onto the CPO’s back-office system.This will require to take place within a 3-month period in order to meet the deadline of the ending of the Charge Place Scotland service. ii. Installation and operation of a minimum of 3,034 additional chargepoints on sites owned or controlled by the MAs (car parks and on-street locations) to be agreed between the MAs and CPO following contract award. To ensure the equitable geographic deployment of new charge points throughout GCR, the deployment programme will require to be undertaken across the 8 MAs at an annual rate proportionate to a MA’s population share within GCR so that the delivery does not favour one geographic area over another.It may also include the installation of additional sites which can be requested by the Lead Authority or proposed by the CPO. Completion timeline period for the new installation of the 3,034 additional charge points is expected to be up to 5 years from contract signing. The contract term will be 20 years. Turnover - at the present time it is estimated that the turnover, over the 20-year contract term and based on an assumption of inflation at 2.5% per annum, will be in the region of GBP 785 million (excluding VAT). Grant Funding - Glasgow City Council, on behalf of the 8 MAs has been allocated a grant of up to GBP 3,300,000 from Transport Scotland’s Electric Vehicle Infrastructure Fund to in connection with the delivery of the project. Bidders are requested to review Document Two - Invitation to Participate which contains the details of the minimum requirements for this procurement within section 3.
Award Criteria
Design and build contract for electric ro-pax ferry on Corran Ferry service, Scotland
Buyer
The Highland CouncilRegion
ScotlandValue
Value not statedVessel electrification or shore power"The Highland Council is seeking to appoint a sole supplier in respect of Shipyard Detailed Design and Build Contract for the procurement of a small, electric roll-on/roll-off passe"
Charge Point Network Operator for ~200 chargers across Stirling, migration from ChargePlace Scotland
Buyer
NatureScot buys a 4x4 road-going electric vehicle for nature reserve maintenance, trialled first, £80k
Buyer
Region
ScotlandValue
EV charging infrastructure"EV Infrastructure Back Office"
Region
ScotlandValue
Electric vehicles"NatureScot requires to purchase a 4x4 road going electric vehicle. The ultimate use of the vehicle will be to serve the maintenance needs of staf…"