TED is live: 30% off your first payment with code TED30 at checkout. See plans
Tender detail
We’ve marked this tender presumed closed: the submission deadline has passed with no award recorded.
EV charging is part of a larger contract. Watch the award to spot a potential subcontracting client.
LHC for the Scottish Procurement Alliance (SPA) framework for energy efficiency consultancy and project management in 8 regional lots, covering 21 measures including EV charging infrastructure, 4 years, £10M estimated value
Region
ScotlandSubmission deadline
12 Mar 2020
Evidence
See who should bid, the buyer’s profile and the competitor landscape.
£79/month · £790/year (save 2 months) · cancel anytime
Oldest first: procurement milestones and pipeline-detected changes combined.
Originally Published
ProcurementTender first published by LHC for the Scottish Procurement Alliance (SPA)
OCDS release history
Submission Closed
ProcurementSubmission period ended
Procurement events come from OCDS release data. Pipeline events are detected by the EVTenders pipeline and reflect when changes were recorded, not original OCDS dates.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.A. External wall insulation;
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s energy efficiency measures and associated works framework agreement (N8), expected to commence in March 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 framework agreement: A. External wall insulation; B. Cavity wall insulation; C. Internal wall insulation; D. Insulation materials (loft); E. Biomass; F. Solar PV with battery storage; G. Air to water heat pumps; H. District heating interface units; I. Traditional boilers; K. Rainscreen and cladding; L. CHP or CCHP; M. Gas absorption heat pumps; N. Boiler optimisation technologies; O. Lighting controls; P. EV charging infrastructure; R. Solar thermal systems; S. Building energy management systems; T. Floor insulation; U. Ground source heat pumps; V. Commercial boilers; W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. internal Wall Insulation D. Insulation Materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV Charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. Internal wall insulation D. Insulation materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. Internal wall insulation D. Insulation materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. Internal wall insulation D. Insulation materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. Internal wall insulation D. Insulation materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. Internal wall insulation D. Insulation materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. Internal wall insulation D. Insulation materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
LHC require the provision of energy efficiency consultancy services, to complement LHC’s Energy Efficiency Measures and Associated Works Framework Agreement (N8), expected to commence in September 2020. As a minimum, tenderers are required to have the capability and experience to provide consultancy services for the delivery of the following 21 energy efficiency measures, which form the core services for the N8 Framework Agreement: A. External wall insulation B. Cavity wall insulation C. Internal wall insulation D. Insulation materials (Loft) E. Biomass F. Solar PV with battery storage G. Air to water heat pumps H. District heating interface units I. Traditional boilers K. Rainscreen and cladding L. CHP or CCHP M. Gas absorption heat pumps N. Boiler optimisation technologies O. Lighting controls P. EV charging infrastructure R. Solar thermal systems S. Building energy management systems T. Floor insulation U. Ground source heat pumps V. Commercial boilers W. Electric heaters.
Design and build contract for electric ro-pax ferry on Corran Ferry service, Scotland
Buyer
The Highland CouncilRegion
ScotlandValue
Value not statedVessel electrification or shore power"The Highland Council is seeking to appoint a sole supplier in respect of Shipyard Detailed Design and Build Contract for the procurement of a small, electric roll-on/roll-off passe"
Charge Point Network Operator for ~200 chargers across Stirling, migration from ChargePlace Scotland
Buyer
NatureScot buys a 4x4 road-going electric vehicle for nature reserve maintenance, trialled first, £80k
Buyer
Region
ScotlandValue
EV charging infrastructure"EV Infrastructure Back Office"
Region
ScotlandValue
Electric vehicles"NatureScot requires to purchase a 4x4 road going electric vehicle. The ultimate use of the vehicle will be to serve the maintenance needs of staf…"