Electric Vehicle Infrastructure Delivery (EVID) – Tranche 1, Batch 2
The Supplier will be responsible for financing, designing the Sites, carrying out required Civils Works, supplying, installing, operating, inspecting, maintaining and decommissioning Charge Points (rated at 50kW or higher) and related infrastructure for electric vehicles on 26 sites owned by TfL on the Transport for London Road Network (TLRN).
- Baseline Spend
- £5M - £10M
- Starts
- Date not stated
- Ends
- 21 November 2038
- Buyer
- Greater London Authority
Key facts
- Supplier
- Zest Eco Limited
- Baseline Spend
- £5M - £10M
- Starts
- Date not stated
- Ends
- 21 November 2038
Source
Greater London Authority's contracts register, read 24 October 2026
No award notice is linked to this contract.